Ballasted ground mount systems are an ideal solution when it comes to building solar farms on landfills, brownfields and other sites where penetrating the ground is difficult or impossible. However, the high cost of pre-casting and shipping concrete ballast has historically been one of the largest line items in these projects’ total installed cost. Choosing to cast foundations on site has the potential to dramatically change project economics and give installers more control over project timelines.
Join SunLink Director of Product Management Kate Trono and Director of Project Management Nick Troia for a discussion about how cast-in-place foundations can lower ballasted ground mount project costs by up to 20 percent, as well as an overview of cast-in-place best practices designed to ensure smooth project installation.
· Topic: How Cast In Place Can Cut Your Costs
· Date and Time: Thursday, March 26, 2015 11 a.m. PDT/2 p.m. EDT
To register click here.
— Solar Builder magazine