Category: Solar Power & Energy
-
Tecta Solar Commences Nearly 900 kW of PV Projects in California
Tecta Solar, a national leader in turnkey solar is pleased to announce the commencement of solar photovoltaic (PV) projects located at Bedrosians Tile’s distribution and showroom facilities in Anaheim, Calif. The PV arrays are 730 kW and 109 kW respectively and are expected to be fully operational before 2015. TheRead More — Solar Builder magazine
-
SoCore Energy Installs 315-kW Solar System at New York Movie Theater
SoCore Energy a wholly-owned indirect subsidiary of Edison International, and Cinemark Holdings Inc. have lit up the big screen with solar power at the Cinemark Tinseltown theatre in Rochester, N.Y. As part of a larger national rollout of Cinemark’s solar installations by SoCore Energy, this theatre has connected 315 kW of solarRead More — Solar Builder magazine
-
Array Technologies, ET Solar Partner on 1.8-MW Solar Project in California
System reliability is always paramount and Bakersfield 111 Solar Park presents Array Technologies Inc. (ATI) and ET Solar’s turn-key solar financial solutions provider, ET Capital, with an interesting case in point. Not only does the 1.8-MWdc facility need to operate properly in the extreme temperatures of the desert-like summers typicalRead More — Solar Builder magazine
-
Bullfrog Power Completes 600-kW SolarShare Project in Ontario
Today, Bullfrog Power, Canada’s leading green energy provider, and SolarShare, Canada’s largest renewable energy co-operative that allows Ontario citizens and businesses to invest in community-based solar energy installations, are launching the first community-owned solar project in the City of Brampton with a rooftop ribbon-cutting. The Holtby project, located on anRead More — Solar Builder magazine
-
Innovative Solar Systems Signs 48-MW PPA with Duke Energy
Innovative Solar Systems, LLC (ISS) has just executed a power purchase agreement (PPA) with Duke Energy for its 48-MW solar farm project, Innovative Solar 41 (IS 41) which is located in Bladen County, N.C., and will be constructed in 2015. IS 41 was one of the selected projects that qualifiedRead More — Solar Builder magazine