Category: Green Building LEED News
-
At your service: How SWTCH eases urban EV charging
The EV charging tech space for commercial and industrial applications is getting interesting (check out a ton of options here). And the innovation is needed. Most multifamily housing or office buildings are over 40 years old and not designed to provide the electrical capacity for a dozen or more full speed level 2 charging stations……
-
At your service: How SWTCH eases urban EV charging
The EV charging tech space for commercial and industrial applications is getting interesting (check out a ton of options here). And the innovation is needed. Most multifamily housing or office buildings are over 40 years old and not designed to provide the electrical capacity for a dozen or more full speed level 2 charging stations……
-
At your service: How SWTCH eases urban EV charging
The EV charging tech space for commercial and industrial applications is getting interesting (check out a ton of options here). And the innovation is needed. Most multifamily housing or office buildings are over 40 years old and not designed to provide the electrical capacity for a dozen or more full speed level 2 charging stations……
-
Charging into C&I: New tech and services ease the addition of EV charging with solar + storage
The growth of electric vehicles (EVs) on the market has been accompanied by a wave of incentives to build out the EV charging infrastructure it will need. While most individual EV owners charge at home, there’s an increasing need for commercial and industrial (C&I) sites to have EV charging, whether for their own fleets or……
-
Soltec supplies 56 MW of its SF7 trackers to the island of Oahu, Hawaii
Soltec will supply its SF7 solar tracker technology for 56 MW of ground mount PV to be built on the island of Oahu, Hawaii. The solar project is owned and operated by the AES Corp. Soltec, which has one of the largest install bases of 2-in-portrait solar trackers, will supply 2,068 units of its SF7……