{"id":10150,"date":"2013-03-06T15:04:55","date_gmt":"2013-03-06T15:04:55","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9246"},"modified":"2013-03-06T15:04:55","modified_gmt":"2013-03-06T15:04:55","slug":"nrg-begins-operations-at-26-mw-borrego-solar-photovoltaic-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nrg-begins-operations-at-26-mw-borrego-solar-photovoltaic-facility\/","title":{"rendered":"NRG Begins Operations at 26 MW Borrego Solar Photovoltaic Facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NRG Energy, Inc., through its wholly owned subsidiary NRG Solar, announced the start of commercial operations for the Borrego I Solar Generating Station, a 26 megawatt (AC) photovoltaic facility located northeast of Borrego Springs, Calif. The station&rsquo;s electricity will be sold to San Diego Gas &amp; Electric under a 25-year power purchase agreement.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[9016,3999,2903,9017,2906,9018,3008,8384,222,4744,3044,4095],"class_list":["post-10150","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-borrego-facility","tag-clean-energy-business","tag-energy","tag-matt-burkhart","tag-news","tag-nrg-begins-operations-at-26-mw-borrego-solar-photovoltaic-facility","tag-press-releases","tag-randy-hickok","tag-renewable-energy","tag-san-diego-gas-electric","tag-solar","tag-solar-business-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/10150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=10150"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/10150\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=10150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=10150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=10150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}