{"id":106721,"date":"2015-04-06T14:06:34","date_gmt":"2015-04-06T14:06:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9194"},"modified":"2015-04-06T14:06:34","modified_gmt":"2015-04-06T14:06:34","slug":"pocomoke-city-goes-with-2-1-mw-system-from-sunedison","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pocomoke-city-goes-with-2-1-mw-system-from-sunedison\/","title":{"rendered":"Pocomoke City Goes with 2.1 MW System from SunEdison"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunEdison Inc., the world&rsquo;s largest renewable energy development company, today announced the completion of a 2.1 megawatt solar energy system that will supply electricity to Maryland&rsquo;s&nbsp;Pocomoke City&rsquo;s wastewater treatment plant via a 20 year power purchase agreement. These projects were on the TerraForm Power call right list and have been<a href=\"http:\/\/solarbuildermag.com\/news\/pocomoke-city-goes-2-1-mw-system-sunedison\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,93,9666],"tags":[2906,13051,3103,12990,13052],"class_list":["post-106721","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-maryland","category-solar-power-energy","tag-news","tag-pocomoke-city","tag-standard-solar","tag-sunedison","tag-terraform-power"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/106721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=106721"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/106721\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=106721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=106721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=106721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}