{"id":10789,"date":"2013-03-28T12:28:33","date_gmt":"2013-03-28T12:28:33","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=826b50741753684c827caa4a807ecbe5"},"modified":"2013-03-28T12:28:33","modified_gmt":"2013-03-28T12:28:33","slug":"solar-panel-kit-supports-remote-applications","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-panel-kit-supports-remote-applications\/","title":{"rendered":"Solar Panel Kit supports remote applications."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>With Series SPK, it is possible to use Dwyer&reg; flowmeters in remote applications where reliable source of electricity is not available or practical. Kit is intended for use with standard 12 V, 22&amp;ndash;33 Ah sealed lead acid battery, which is not included. Supplied with charge controller and corrosion-resistant mounting hardware,&nbsp;5&nbsp;W solar panel can also be used to provide up to 40-day back-up power supply for periods of darkness. <\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/electrical-equipment-systems\" target=\"_blank\">Electrical Equipment and Systems<\/a> Sponsored by:  <a target=\"_blank\" href=\"http:\/\/news.thomasnet.com\/redir.html?lnty=rssad&amp;spclid=7452&amp;prid=20005501&amp;cat=612&amp;goto=http%3A%2F%2Fwww.globtek.com\">Globtek Inc. &#8211; Your Power Partner&#8230;For Over 20 Years!<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/green-clean\" target=\"_blank\">Green &amp; Clean<\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/commercial-industrial-solar-power-systems-96076401-1.html\" target=\"_blank\">Commercial &amp; Industrial Solar Power Systems<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/solar-energy-equipment-76181684-1.html\" target=\"_blank\">Solar Energy Equipment<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-10789","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/10789","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=10789"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/10789\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=10789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=10789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=10789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}