{"id":110237,"date":"2015-04-16T16:32:19","date_gmt":"2015-04-16T16:32:19","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9285"},"modified":"2015-04-16T16:32:19","modified_gmt":"2015-04-16T16:32:19","slug":"algonquin-power-and-utilities-corp-bakersfield-facility-operational","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/algonquin-power-and-utilities-corp-bakersfield-facility-operational\/","title":{"rendered":"Algonquin Power and Utilities Corp Bakersfield Facility Operational"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Algonquin Power and Utilities Corp.&rsquo;s 20-megawatt Bakersfield I Solar generation and its 23-megawatt Morse Wind generation projects are now operational and selling renewable power in Canada and the United States. Bakersfield I Solar, located in Kern County, California, is Algonquin Power and Utilities Corp.&rsquo;s second solar generating facility and is<a href=\"http:\/\/solarbuildermag.com\/news\/algonquin-power-and-utilities-corp-bakersfield-facility-operational\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,5462,57,9666],"tags":[13092,2906,9667],"class_list":["post-110237","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-canada-international","category-leed-news","category-solar-power-energy","tag-algonquin-power-and-utilities","tag-news","tag-pacific"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/110237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=110237"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/110237\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=110237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=110237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=110237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}