{"id":111983,"date":"2015-04-24T20:30:40","date_gmt":"2015-04-24T20:30:40","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9329"},"modified":"2015-04-24T20:30:40","modified_gmt":"2015-04-24T20:30:40","slug":"vizn-energy-systems-zinc-iron-flow-battery-commissioned-at-randolph-macon-college-as-part-of-dominion-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vizn-energy-systems-zinc-iron-flow-battery-commissioned-at-randolph-macon-college-as-part-of-dominion-solar-project\/","title":{"rendered":"ViZn Energy Systems\u2019 Zinc-Iron Flow Battery Commissioned at Randolph-Macon College as Part of Dominion Solar Project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Project demonstrating grid-scale energy storage with solar generation ViZn Energy Systems Inc. (ViZn), a leading provider of energy storage systems for microgrid and utility-scale applications, announces its advanced flow battery system has been installed at Randolph-Macon College to test utility integration with renewable generation.&nbsp; Randolph-Macon College is in partnership on<a href=\"http:\/\/solarbuildermag.com\/news\/vizn-energy-systems-zinc-iron-flow-battery-commissioned-at-randolph-macon-college-as-part-of-dominion-solar-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13106],"class_list":["post-111983","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-vizn-energy-systems-inc-vizn"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/111983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=111983"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/111983\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=111983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=111983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=111983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}