{"id":113588,"date":"2015-05-26T20:36:37","date_gmt":"2015-05-26T20:36:37","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9467"},"modified":"2015-05-26T20:36:37","modified_gmt":"2015-05-26T20:36:37","slug":"spower-breaks-ground-on-22-5-mw-sierra-solar-facility-in-la-county","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spower-breaks-ground-on-22-5-mw-sierra-solar-facility-in-la-county\/","title":{"rendered":"sPower breaks ground on 22.5 MW Sierra Solar Facility in LA County"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>sPower, a leading renewable energy provider, broke ground on a 22.5 MW solar project in Lancaster, Calif. The Sierra Solar project is sPower&rsquo;s first in Los Angeles County. The EPC contract was awarded to Rosendin Electric, which will install more than 250,000 First Solar PV&nbsp;modules in a fixed ground mount<a href=\"http:\/\/solarbuildermag.com\/news\/spower-solar-facility-los-angeles\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13168,13148,10045],"class_list":["post-113588","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-sierra-solar-project","tag-spower","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/113588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=113588"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/113588\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=113588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=113588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=113588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}