{"id":113618,"date":"2015-05-27T15:24:37","date_gmt":"2015-05-27T15:24:37","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9482"},"modified":"2015-05-27T15:24:37","modified_gmt":"2015-05-27T15:24:37","slug":"calcom-solar-starts-1-1-mw-install-at-medeiros-and-son-dairy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/calcom-solar-starts-1-1-mw-install-at-medeiros-and-son-dairy\/","title":{"rendered":"CalCom Solar starts 1.1 MW install at Medeiros and Son Dairy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>CalCom Solar has started the installation of a new 1.1 MW solar power system at Medeiros and Son Dairy in Hanford, Calif. The project will be completed&nbsp;this summer. &ldquo;CalCom Solar is making solar energy work for us, both operationally and financially,&rdquo; said Brian Medeiros. &ldquo;The dairy business takes constant evaluation<a href=\"http:\/\/solarbuildermag.com\/news\/calcom-solar-starts-1-1-mw-install-at-medeiros-and-son-dairy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13009,1208,13170,2906,13010,10045],"class_list":["post-113618","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-calcom-solar","tag-dairy","tag-farm","tag-news","tag-nextracker","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/113618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=113618"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/113618\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=113618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=113618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=113618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}