{"id":114286,"date":"2015-06-15T14:03:59","date_gmt":"2015-06-15T14:03:59","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9672"},"modified":"2015-06-15T14:03:59","modified_gmt":"2015-06-15T14:03:59","slug":"solar-power-inc-vision-edge-limited-reach-40-million-purchase-agreement","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-power-inc-vision-edge-limited-reach-40-million-purchase-agreement\/","title":{"rendered":"Solar Power Inc., Vision Edge Limited reach $40 million purchase agreement"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar Power, Inc. (SPI), a vertically integrated PV&nbsp;developer, entered&nbsp;into a convertible promissory note purchase agreement and an option agreement with Vision Edge Limited relating to a new private placement of up to $40 million. According&nbsp;to the agreements, Vision Edge agreed to purchase a principal amount of $20 million of convertible<a href=\"http:\/\/solarbuildermag.com\/news\/solar-power-inc-vision-edge-limited-reach-40-million-purchase-agreement\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13239,13240,13241],"class_list":["post-114286","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-purchase-agreement","tag-solar-power-inc","tag-vision-edge-limited"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=114286"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114286\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=114286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=114286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=114286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}