{"id":114418,"date":"2015-06-18T17:03:27","date_gmt":"2015-06-18T17:03:27","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9724"},"modified":"2015-06-18T17:03:27","modified_gmt":"2015-06-18T17:03:27","slug":"globaldata-hanergys-troubles-stem-from-thin-film-module-outlook","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/globaldata-hanergys-troubles-stem-from-thin-film-module-outlook\/","title":{"rendered":"GlobalData: Hanergy\u2019s troubles stem from thin-film module outlook"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Chinese PV&nbsp;manufacturer Hanergy has been in the news lately for the wrong reasons, such as a dropping stock and recently canceled $585 million order (see this Financial Times article for many of the details). GlobalData analyst&nbsp;Amit Sharma says that these problems&nbsp;are largely because of an &ldquo;overly optimistic approach regarding its<a href=\"http:\/\/solarbuildermag.com\/news\/globaldata-hanergys-troubles-stem-from-thin-film-module-outlook\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[623,13262,12923,2906,5863,1123,5913],"class_list":["post-114418","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-china","tag-globaldata","tag-hanergy","tag-news","tag-pv-modules","tag-reports","tag-thin-film"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=114418"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114418\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=114418"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=114418"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=114418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}