{"id":114634,"date":"2015-06-22T14:06:47","date_gmt":"2015-06-22T14:06:47","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9738"},"modified":"2015-06-22T14:06:47","modified_gmt":"2015-06-22T14:06:47","slug":"xcel-energy-denied-solar-power-proposal-by-north-dakota-regulators","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/xcel-energy-denied-solar-power-proposal-by-north-dakota-regulators\/","title":{"rendered":"Xcel Energy denied solar power proposal by North Dakota regulators"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>This doesn&rsquo;t happen often, but Xcel Energy was denied application for an ADP by the North Dakota Public Service Commission, after the utility regulators ruled that Xcel Energy&rsquo;s proposal wasn&rsquo;t cost effective enough &ndash; that it would raise costs without delivering clear benefits. This is the first time the commission<a href=\"http:\/\/solarbuildermag.com\/news\/xcel-energy-denied-solar-power-proposal-by-north-dakota-regulators\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9679,2906,13172,13266],"class_list":["post-114634","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-midwest","tag-news","tag-utility","tag-xcel-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114634","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=114634"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114634\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=114634"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=114634"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=114634"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}