{"id":114969,"date":"2015-06-29T19:08:47","date_gmt":"2015-06-29T19:08:47","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9793"},"modified":"2015-06-29T19:08:47","modified_gmt":"2015-06-29T19:08:47","slug":"content-solar-opic-sign-47m-deal-for-pv-facility-in-jamaica","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/content-solar-opic-sign-47m-deal-for-pv-facility-in-jamaica\/","title":{"rendered":"Content Solar, OPIC sign $47M deal for PV facility in Jamaica"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Overseas Private Investment Corporation (OPIC), the U.S. Government&rsquo;s Development Finance Institution, signed a financing agreement with Content Solar Ltd., solidifying a $47 million OPIC loan to support a 20 MW&nbsp;grid-connected solar PV&nbsp;facility in Clarendon, Jamaica. The project is being developed by Tampa, Fla.-based WRB Enterprises (WRB). WRB will be<a href=\"http:\/\/solarbuildermag.com\/news\/content-solar-opic-47m-deal-pv-jamaica\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1086,12490,2906,1699,13285],"class_list":["post-114969","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-jamaica","tag-latin","tag-news","tag-opic","tag-wrb-enterprises"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=114969"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/114969\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=114969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=114969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=114969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}