{"id":115030,"date":"2015-06-30T20:09:28","date_gmt":"2015-06-30T20:09:28","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9814"},"modified":"2015-06-30T20:09:28","modified_gmt":"2015-06-30T20:09:28","slug":"andalay-module-compatible-with-solaredge-power-optimizers","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/andalay-module-compatible-with-solaredge-power-optimizers\/","title":{"rendered":"Andalay module compatible with SolarEdge power optimizers"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Andalay Solar, Inc., a supplier of integrated solar power systems, announced that its Instant Connect Module is compatible with power optimizers supplied by SolarEdge Technologies, a large provider of PV inverters, power optimizers, and module-level monitoring services. The SolarEdge module add-on power optimizer can now be snapped onto the Andalay<a href=\"http:\/\/solarbuildermag.com\/news\/andalay-module-compatible-with-solaredge-power-optimizers\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13250,13291,2906,13259,3000,5863,13109],"class_list":["post-115030","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-andalay-solar","tag-integration","tag-news","tag-power-optimizers","tag-products","tag-pv-modules","tag-solaredge"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/115030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=115030"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/115030\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=115030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=115030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=115030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}