{"id":115502,"date":"2015-07-13T12:57:22","date_gmt":"2015-07-13T12:57:22","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=9891"},"modified":"2015-07-13T12:57:22","modified_gmt":"2015-07-13T12:57:22","slug":"varta-storage-to-debut-engion-sentry-6-8-kw-storage-system-intersolar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/varta-storage-to-debut-engion-sentry-6-8-kw-storage-system-intersolar\/","title":{"rendered":"VARTA Storage to debut\u00a0Engion Sentry 6.8 kW\u00a0storage system #Intersolar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The VARTA Micro Group, a designer and manufacturer&nbsp;of an extensive variety of high-technology rechargeable and primary batteries, announced that its subsidiary VARTA Storage GmbH has expanded its compact and powerful Engion product line of energy storage systems to include Engion Sentry automatic backup power battery storage system, which features 6.8<a href=\"http:\/\/solarbuildermag.com\/products\/varta-storage-to-debut-engion-sentry-6-8-kw-storage-system-intersolar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,13311,13308,3000,13312],"class_list":["post-115502","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-engion","tag-intersolar-2015","tag-products","tag-varta"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/115502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=115502"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/115502\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=115502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=115502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=115502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}