{"id":11616,"date":"2013-04-19T14:24:42","date_gmt":"2013-04-19T14:24:42","guid":{"rendered":"http:\/\/www.solarbuildermag.com\/?p=4104"},"modified":"2013-04-19T14:24:42","modified_gmt":"2013-04-19T14:24:42","slug":"second-10-mw-solar-farm-approved-for-indianapolis-intl-airport","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/second-10-mw-solar-farm-approved-for-indianapolis-intl-airport\/","title":{"rendered":"Second 10-MW Solar Farm Approved for Indianapolis Int\u2019l Airport"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Indianapolis Airport Authority (IAA) announced today that it has selected a Joint Venture group between two locally owned companies, Johnson Melloh Solutions and Telamon, to develop a second 10-MW Solar Farm on Indianapolis International Airport (IND) property. Bulldog Energy [&#8230;]<\/p>\n<p>&#8212; Solar Builder magazine <\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9695,9696,9694,9697,8008],"class_list":["post-11616","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-airport","tag-indianapolis-airport","tag-indianapolis-power-and-light","tag-indianapolis-power-and-light-company","tag-kilowatt-hours"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/11616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=11616"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/11616\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=11616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=11616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=11616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}