{"id":116910,"date":"2015-08-19T14:59:12","date_gmt":"2015-08-19T14:59:12","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10328"},"modified":"2015-08-19T14:59:12","modified_gmt":"2015-08-19T14:59:12","slug":"6-mw-florida-power-plant-just-completed-by-sunedison","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/6-mw-florida-power-plant-just-completed-by-sunedison\/","title":{"rendered":"6-MW Florida power plant just completed by SunEdison"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Construction of a new 6-MW AC solar power plant&nbsp;was completed by&nbsp;SunEdison that will supply electricity to Lakeland Electric, the third largest public power utility in the State of Florida, through a 25-year power purchase agreement. The Bella Vista solar power plant is expected to generate approximately 14 GWh&nbsp;of electricity each<a href=\"http:\/\/solarbuildermag.com\/news\/sunedison-florida-solar-power-plant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,57,9666],"tags":[2906,12497,9751,12990,13442],"class_list":["post-116910","post","type-post","status-publish","format-standard","hentry","category-florida-leed-projects","category-leed-news","category-solar-power-energy","tag-news","tag-project","tag-south","tag-sunedison","tag-utlity"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/116910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=116910"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/116910\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=116910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=116910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=116910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}