{"id":116954,"date":"2015-08-20T19:00:50","date_gmt":"2015-08-20T19:00:50","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10351"},"modified":"2015-08-20T19:00:50","modified_gmt":"2015-08-20T19:00:50","slug":"spower-wins-lancaster-choice-energy-10-mw-ppa","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spower-wins-lancaster-choice-energy-10-mw-ppa\/","title":{"rendered":"sPower wins Lancaster Choice Energy 10 MW PPA"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Lancaster Choice Energy, Lancaster, Calif.&rsquo;s&nbsp;new, locally operated, locally controlled clean power provider, announced awarded sPower, a prominent renewable energy company, a 20-year Power Purchase Agreement (PPA) to provide 10 MW&nbsp;AC&nbsp;of solar power. The power will be generated at the sPower Western Antelope Dry Ranch facility, to be located at 105th<a href=\"http:\/\/solarbuildermag.com\/news\/spower-lancaster-choice-energy-ppa\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13447,2906,9667,13429,12497,13148,13172],"class_list":["post-116954","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-lancaster-choice-energy","tag-news","tag-pacific","tag-ppa","tag-project","tag-spower","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/116954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=116954"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/116954\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=116954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=116954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=116954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}