{"id":117237,"date":"2015-08-31T13:48:51","date_gmt":"2015-08-31T13:48:51","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10459"},"modified":"2015-08-31T13:48:51","modified_gmt":"2015-08-31T13:48:51","slug":"recurrent-energy-southern-power-take-charge-of-200-mw-tranquility-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/recurrent-energy-southern-power-take-charge-of-200-mw-tranquility-project\/","title":{"rendered":"Recurrent Energy, Southern Power take charge of 200-MW Tranquility project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar announced that its wholly owned subsidiary, Recurrent Energy, one of North America&rsquo;s largest solar project developers, signed an agreement with Southern Power&nbsp;for&nbsp;Southern Power to acquire a controlling interest in the 200-MW Tranquillity Solar Power Project in California. The project, developed by Recurrent Energy, is currently under construction. Under<a href=\"http:\/\/solarbuildermag.com\/news\/canadian-solar-recurrent-energy-development\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[12961,12107,2906,9667,12963,13470,13172],"class_list":["post-117237","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-development","tag-news","tag-pacific","tag-recurrent-energy","tag-southern-power","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/117237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=117237"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/117237\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=117237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=117237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=117237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}