{"id":117254,"date":"2015-08-31T20:28:32","date_gmt":"2015-08-31T20:28:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10475"},"modified":"2015-08-31T20:28:32","modified_gmt":"2015-08-31T20:28:32","slug":"vote-2015-solar-builder-project-of-the-year-awards-ground-mounted","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vote-2015-solar-builder-project-of-the-year-awards-ground-mounted\/","title":{"rendered":"VOTE: 2015 Solar Builder Project of the Year Awards \u2014 Ground-mounted"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Charlton Solar Charlton, Mass. Completed: Dec. 31, 2014 Size: 4.4-MW DC Constrained by population densities and interconnection capacity, most optimal solar sites in the Northeast have already been developed, leaving more challenging landscapes necessitating site-specific designs. The 4.4-MW Charlton Solar plant in Massachusetts, one of two &ldquo;managed growth&rdquo; projects built<a href=\"http:\/\/solarbuildermag.com\/news\/vote-2015-project-of-the-year-ground-mounted\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13474,13475,13476,13477,12961,13478,13479,13480,4737,13481,13482,13483,12637,2906,13096,13087,13412,5863,12946,13095,13484,13485,13486,13436,13050,12904,13487,13488,13489,13490],"class_list":["post-117254","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-a-r-solar","tag-ae-solar","tag-array-technologies-inc","tag-cambridge-solar","tag-canadian-solar","tag-charlton-solar","tag-clark-public-utilities-community-solar-project","tag-clean-energy-collective","tag-featured","tag-grosolar","tag-hanwha-solarone","tag-itek-energy","tag-mounting-guide","tag-news","tag-nexamp","tag-oneenergy-renewables","tag-osceola-energy","tag-pv-modules","tag-rbi-solar","tag-residential-solar","tag-s-flex","tag-santa-ana-golf-club-solar-carport","tag-schletter","tag-sma-america","tag-solar-trackers","tag-solectria","tag-sunmodo-corp","tag-sunnyside-ranch-community-solar-array","tag-sunsense-solar","tag-yingli-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/117254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=117254"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/117254\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=117254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=117254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=117254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}