{"id":118300,"date":"2015-09-29T14:30:51","date_gmt":"2015-09-29T14:30:51","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10867"},"modified":"2015-09-29T14:30:51","modified_gmt":"2015-09-29T14:30:51","slug":"ideal-power-to-fulfill-1-5-mw-for-its-power-conversion-systems-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ideal-power-to-fulfill-1-5-mw-for-its-power-conversion-systems-in-california\/","title":{"rendered":"Ideal Power to fulfill 1.5 MW for its power conversion systems in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ideal Power Inc. received an order for 1.5 MW of its 30-kW Battery Converters and Grid Resilient Power Conversion Systems, based on the company&rsquo;s patented Power Packet Switching Architecture (PPSA), for integration into commercial and industrial energy storage systems in California. This is the first volume order received from a<a href=\"http:\/\/solarbuildermag.com\/news\/ideal-power-power-conversion-systems\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13047,2906,9667,13396,5863],"class_list":["post-118300","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ideal-power","tag-news","tag-pacific","tag-power-conversion","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=118300"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118300\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=118300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=118300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=118300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}