{"id":118401,"date":"2015-10-01T21:44:05","date_gmt":"2015-10-01T21:44:05","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10896"},"modified":"2015-10-01T21:44:05","modified_gmt":"2015-10-01T21:44:05","slug":"nextracker-ships-self-powered-solar-trackers-to-big-sunedison-project-in-latin-america","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nextracker-ships-self-powered-solar-trackers-to-big-sunedison-project-in-latin-america\/","title":{"rendered":"NEXTracker ships self-powered solar trackers to big SunEdison project in Latin America"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NEXTracker, designer and manufacturer of advanced single axis PV trackers, completed a 110 MW&nbsp;DC shipment of its Self-Powered Tracker (SPT) to SunEdison&rsquo;s Quilapil&uacute;n power plant in the Santiago metropolitan region of Chile. Once completed, the project will be SunEdison&rsquo;s largest in South America and the first such project in a<a href=\"http:\/\/solarbuildermag.com\/news\/nextracker-ships-self-powered-solar-trackers-to-big-sunedison-project-in-latin-america\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13010,9974,13050,12990],"class_list":["post-118401","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-nextracker","tag-projects","tag-solar-trackers","tag-sunedison"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=118401"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118401\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=118401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=118401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=118401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}