{"id":118510,"date":"2015-10-05T13:52:43","date_gmt":"2015-10-05T13:52:43","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10910"},"modified":"2015-10-05T13:52:43","modified_gmt":"2015-10-05T13:52:43","slug":"skylar-resources-acquires-rights-to-develop-180-mw-nevada-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/skylar-resources-acquires-rights-to-develop-180-mw-nevada-solar-project\/","title":{"rendered":"Skylar Resources acquires rights to develop 180-MW Nevada solar project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Skylar Resources L.P. acquired 100 percent interest in the option rights to develop the 180-MW&nbsp;Townsite PV&nbsp;project that KOWEPO Americas developed in Boulder City, Nev. Terms of the transaction were not disclosed. Located 30 miles southeast of Las Vegas, the Townsite project is shovel-ready, fully permitted and ITC eligible. The project<a href=\"http:\/\/solarbuildermag.com\/news\/skylar-resources-acquires-rights-to-develop-180-mw-nevada-solar-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12107,654,2906,9974,13602,13603,10045],"class_list":["post-118510","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-development","tag-nevada","tag-news","tag-projects","tag-skylar-resources","tag-townsite-solar","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118510","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=118510"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118510\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=118510"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=118510"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=118510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}