{"id":118584,"date":"2015-10-06T18:43:26","date_gmt":"2015-10-06T18:43:26","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=10938"},"modified":"2015-10-06T18:43:26","modified_gmt":"2015-10-06T18:43:26","slug":"sunedison-completes-1-2-mw-projects-for-minnesota-wastewater-plant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunedison-completes-1-2-mw-projects-for-minnesota-wastewater-plant\/","title":{"rendered":"SunEdison completes 1.2 MW projects for Minnesota wastewater plant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunEdison Inc. completed two solar power systems totaling 1.2 MW&nbsp;AC for the Metropolitan Council of the Twin Cities&rsquo; wastewater treatment plant in partnership with Oak Leaf Energy Partners, a national solar developer. SunEdison constructed and financed the installations and will be the long-term owner and operator of the systems. The<a href=\"http:\/\/solarbuildermag.com\/news\/sunedison-completes-1-2-mw-projects-for-minnesota-wastewater-plant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,5520,9666],"tags":[9679,2906,13607,12990,13172],"class_list":["post-118584","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-minnesota-leed-projects","category-solar-power-energy","tag-midwest","tag-news","tag-oak-leaf-energy-partners","tag-sunedison","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=118584"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118584\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=118584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=118584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=118584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}