{"id":118750,"date":"2015-10-09T19:24:50","date_gmt":"2015-10-09T19:24:50","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11023"},"modified":"2015-10-09T19:24:50","modified_gmt":"2015-10-09T19:24:50","slug":"ideal-power-to-send-power-conversion-systems-to-enerdel-for-multiple-microgrids","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ideal-power-to-send-power-conversion-systems-to-enerdel-for-multiple-microgrids\/","title":{"rendered":"Ideal Power to send power conversion systems to EnerDel for multiple microgrids"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ideal Power Inc. received a multi-unit purchase order from EnerDel, a manufacturer of advanced lithium-ion batteries and energy storage systems for electric grid, transportation and industrial applications, for its Grid-Resilient 30-kW Multi-Port Power Conversion Systems that&nbsp;will be used for multiple microgrid installations. The systems are scheduled to ship in Q4<a href=\"http:\/\/solarbuildermag.com\/news\/ideal-power-to-send-power-conversion-systems-to-enerdel-for-multiple-microgrids\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13623,13047,697,2906,13295,3000],"class_list":["post-118750","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-enerdel","tag-ideal-power","tag-microgrid","tag-news","tag-power-conversion-system","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=118750"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/118750\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=118750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=118750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=118750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}