{"id":119517,"date":"2015-10-13T15:00:44","date_gmt":"2015-10-13T15:00:44","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11044"},"modified":"2015-10-13T15:00:44","modified_gmt":"2015-10-13T15:00:44","slug":"simpliphil-power-batteries-earn-high-marks-in-marine-corps-storage-tests","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/simpliphil-power-batteries-earn-high-marks-in-marine-corps-storage-tests\/","title":{"rendered":"SimpliPhil Power Batteries Earn High Marks in Marine Corps Storage Tests"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SimpliPhi Power&rsquo;s OES 1.3kWh and OES 2.6kWh High-Output batteries were just rigorously tested by extreme discharge and charge parameters utilized by the Marine Corps, and the company reports that they outperformed the baseline control High-Energy Lithium Battery (HELB) at Camp Lejeune, in North Carolina. The Marine Corps conducted a range<a href=\"http:\/\/solarbuildermag.com\/news\/simpliphil-power-batteries-earn-high-marks-in-marine-corps-storage-tests\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13631],"class_list":["post-119517","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-simpliphi-power"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/119517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=119517"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/119517\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=119517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=119517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=119517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}