{"id":119866,"date":"2015-10-14T14:57:42","date_gmt":"2015-10-14T14:57:42","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11048"},"modified":"2015-10-14T14:57:42","modified_gmt":"2015-10-14T14:57:42","slug":"aet-to-provide-racking-system-for-252-kw-microgrid-energy-rooftop-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/aet-to-provide-racking-system-for-252-kw-microgrid-energy-rooftop-project\/","title":{"rendered":"AET to provide racking system for 252 kW Microgrid Energy rooftop project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; Applied Energy Technologies (AET), a preferred supplier of commercial and utility-scale racking systems and one of the top 10 solar racking companies in the United States, was selected by Microgrid Energy to supply its Rayport-B ECO roof ballast system for a 252 kW project in Joliet, Ill. The building<a href=\"http:\/\/solarbuildermag.com\/news\/aet-to-provide-racking-system-for-252-kw-microgrid-energy-rooftop-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12940,12941,697,13634,12637,2906,9974,13635],"class_list":["post-119866","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-aet","tag-applied-energy-technologies","tag-microgrid","tag-microgrid-energy","tag-mounting-guide","tag-news","tag-projects","tag-racking-system"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/119866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=119866"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/119866\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=119866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=119866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=119866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}