{"id":12095,"date":"2013-05-04T14:47:03","date_gmt":"2013-05-04T14:47:03","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9580"},"modified":"2013-05-04T14:47:03","modified_gmt":"2013-05-04T14:47:03","slug":"nrg-solar-cuts-ribbon-on-alpine-solar-generating-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nrg-solar-cuts-ribbon-on-alpine-solar-generating-facility\/","title":{"rendered":"NRG Solar Cuts Ribbon on Alpine Solar Generating Facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The 66 megawatt (AC) Alpine solar photovoltaic facility, which started commercial operations earlier this year, is currently the largest fully operational solar plant in California. The cost-competitive, renewable power generated by the facility is being sold to PG&amp;E under a 20-year power purchase agreement.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[9891,9892,2903,9893,4,2906,9894,3008,8384,222,3044],"class_list":["post-12095","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-alpine-solar-generating-facility","tag-ca-solare-news","tag-energy","tag-lancaster","tag-leed","tag-news","tag-nrg-solar-cuts-ribbon-on-alpine-solar-generating-facility","tag-press-releases","tag-randy-hickok","tag-renewable-energy","tag-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/12095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=12095"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/12095\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=12095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=12095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=12095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}