{"id":121818,"date":"2015-10-20T19:35:00","date_gmt":"2015-10-20T19:35:00","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11108"},"modified":"2015-10-20T19:35:00","modified_gmt":"2015-10-20T19:35:00","slug":"see-floridas-largest-private-solar-carport","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/see-floridas-largest-private-solar-carport\/","title":{"rendered":"See Florida\u2019s largest private solar carport"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Lockheed Martin joined Florida Governor Rick Scott, Duke Energy President of Florida Utility Operations Alex Glenn and other local officials to celebrate the powering up of its 151,400-sq-ft solar array covering the parking lot at its facility near Clearwater, Fla. The project represents Florida&rsquo;s largest, private solar array. Lockheed Martin<a href=\"http:\/\/solarbuildermag.com\/news\/see-floridas-largest-private-solar-carport\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13644,13482,2906,12497,9751,13167],"class_list":["post-121818","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carports","tag-hanwha-solarone","tag-news","tag-project","tag-south","tag-sungrow"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/121818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=121818"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/121818\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=121818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=121818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=121818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}