{"id":122163,"date":"2015-10-21T17:00:37","date_gmt":"2015-10-21T17:00:37","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11121"},"modified":"2015-10-21T17:00:37","modified_gmt":"2015-10-21T17:00:37","slug":"hawaii-residents-asked-to-choose-self-supply-or-grid-supply-in-next-move-to-smart-grid","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hawaii-residents-asked-to-choose-self-supply-or-grid-supply-in-next-move-to-smart-grid\/","title":{"rendered":"Hawaii residents asked to choose \u2018self-supply\u2019 or \u2018grid-supply\u2019 in next move to smart grid"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Starting today, renewable-energy project developers seeking interconnection to the HECO companies&rsquo; utility grids will face two new PUC-driven tariff requirements, termed &ldquo;self-supply&rdquo; and &ldquo;grid supply&rdquo;, that will replace the NEM program and pave the way for so-called smart grid functionality. Out goes the NEM program, which led to Hawaii&rsquo;s massive<a href=\"http:\/\/solarbuildermag.com\/news\/hawaii-residents-asked-to-choose-self-supply-or-grid-supply-in-next-move-to-smart-grid\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13651,13235,249,2906,9667],"class_list":["post-122163","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-apparent-inc","tag-grid-management","tag-hawaii","tag-news","tag-pacific"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/122163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=122163"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/122163\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=122163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=122163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=122163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}