{"id":122543,"date":"2015-10-22T20:00:07","date_gmt":"2015-10-22T20:00:07","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11136"},"modified":"2015-10-22T20:00:07","modified_gmt":"2015-10-22T20:00:07","slug":"spower-wins-68-8-mw-southern-california-public-power-authority","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spower-wins-68-8-mw-southern-california-public-power-authority\/","title":{"rendered":"sPower wins 68.8-MW Southern California Public Power Authority"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>sPower, a prominent renewable energy provider, has been awarded a 20-year PPA with Southern California Public Power Authority (SCPPA) to provide 68.8 MW&nbsp;DC&nbsp;of solar power. Participating member agencies are the cities of Azusa, Colton, Riverside and Vernon. The sPower Antelope DSR 1 and 2 facilities will be constructed on roughly<a href=\"http:\/\/solarbuildermag.com\/news\/spower-wins-68-8-mw-southern-california-public-power-authority\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,13429,9974,13652,13148,13172],"class_list":["post-122543","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-ppa","tag-projects","tag-southern-california-public-power-authority","tag-spower","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/122543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=122543"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/122543\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=122543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=122543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=122543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}