{"id":126259,"date":"2015-11-04T14:50:32","date_gmt":"2015-11-04T14:50:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11267"},"modified":"2015-11-04T14:50:32","modified_gmt":"2015-11-04T14:50:32","slug":"sungrow-inverters-installed-in-2-25-mw-carport-in-florida","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sungrow-inverters-installed-in-2-25-mw-carport-in-florida\/","title":{"rendered":"Sungrow inverters installed in 2.25-MW carport in Florida"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sungrow supplied its 60-kw string inverter to a 2.25 MW Lockheed Martin-owned solar carport &mdash; a 151,400-sq-ft solar array covering the parking lot at its facility near Clearwater, Fla. The project represents Florida&rsquo;s largest, private solar array. Lockheed Martin and lead contractor Advanced Green Technologies broke ground on the project<a href=\"http:\/\/solarbuildermag.com\/news\/sungrow-inverters-installed-in-2-25-mw-carport-in-florida\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12834,13203,12491,2906,9751,13167],"class_list":["post-126259","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carport","tag-commercial","tag-inverters","tag-news","tag-south","tag-sungrow"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/126259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=126259"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/126259\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=126259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=126259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=126259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}