{"id":128524,"date":"2015-11-12T20:53:03","date_gmt":"2015-11-12T20:53:03","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11381"},"modified":"2015-11-12T20:53:03","modified_gmt":"2015-11-12T20:53:03","slug":"logistics-power-aet-delivers-racking-for-7-mw-calif-project-in-one-week","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/logistics-power-aet-delivers-racking-for-7-mw-calif-project-in-one-week\/","title":{"rendered":"Logistics power: AET delivers racking for 7-MW Calif. project in one week"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Applied Energy Technologies (AET) prides itself on its logistical capabilities, which played a big part in its selection by Swinerton Renewable Energy for a 7 MW solar PV installation in Mendota, Calif., currently under construction. Along with providing its Rayport-G ECO ground mount system, AET&rsquo;s engineering team provided the full<a href=\"http:\/\/solarbuildermag.com\/news\/aet-solar-racking-logistics-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12940,12941,12496,12637,2906,9974,13255,13355,10045],"class_list":["post-128524","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-aet","tag-applied-energy-technologies","tag-mounting","tag-mounting-guide","tag-news","tag-projects","tag-racking","tag-swinerton-renewable-energy","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/128524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=128524"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/128524\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=128524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=128524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=128524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}