{"id":129711,"date":"2015-11-17T15:08:10","date_gmt":"2015-11-17T15:08:10","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11450"},"modified":"2015-11-17T15:08:10","modified_gmt":"2015-11-17T15:08:10","slug":"mississippi-solar-boost-strata-solar-works-with-local-power-on-50-mw-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/mississippi-solar-boost-strata-solar-works-with-local-power-on-50-mw-project\/","title":{"rendered":"Mississippi solar boost: Strata Solar works with local power on 50-MW project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Mississippi Public Service Commission approved the largest solar installations in Mississippi on Nov. 10, making Mississippi Power the largest partner in renewable energy in the state.&nbsp;Strata Solar is collaborating with Mississippi Power and the U.S. Navy to build a 450-acre 50-MW solar project in Hattiesburg.&nbsp;Strata Solar specializes in utility<a href=\"http:\/\/solarbuildermag.com\/news\/mississippi-solar-boost-strata-solar-works-with-local-power-on-50-mw-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13708,2906,9974,9751,13283,13172],"class_list":["post-129711","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mississppi-power","tag-news","tag-projects","tag-south","tag-strata-solar","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/129711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=129711"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/129711\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=129711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=129711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=129711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}