{"id":131875,"date":"2015-11-24T17:00:34","date_gmt":"2015-11-24T17:00:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11562"},"modified":"2015-11-24T17:00:34","modified_gmt":"2015-11-24T17:00:34","slug":"ati-completes-75-mw-solar-tracking-site-in-arizona","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ati-completes-75-mw-solar-tracking-site-in-arizona\/","title":{"rendered":"ATI completes 75-MW solar tracking site in Arizona"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; Array Technologies, Inc. (ATI) just&nbsp;completed&nbsp;a huge tracking system as part of a&nbsp;71 MW AC project, called Red Horse 2, which combines wind and solar is expected to provide power for 13,500 Arizona homes. The plant generates energy from Vestas V110 wind turbines and 75 MW DC of Jinko solar<a href=\"http:\/\/solarbuildermag.com\/news\/11562\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13476,13354,2906,9974,13050,9674,13728,13172],"class_list":["post-131875","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-array-technologies-inc","tag-ati","tag-news","tag-projects","tag-solar-trackers","tag-southwest","tag-trackers","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/131875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=131875"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/131875\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=131875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=131875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=131875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}