{"id":133606,"date":"2015-11-30T21:31:10","date_gmt":"2015-11-30T21:31:10","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11580"},"modified":"2015-11-30T21:31:10","modified_gmt":"2015-11-30T21:31:10","slug":"one-canadian-province-announces-ambitious-renewable-goals","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/one-canadian-province-announces-ambitious-renewable-goals\/","title":{"rendered":"One Canadian province announces ambitious renewable goals"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Alberta, Canada, has a plan to tackle climate change. Premier Rachel Notley&rsquo;s plan includes an accelerated phase-out of coal and an emphasis on tripling the share of renewable energies such as solar and wind in the province&rsquo;s electricity mix to 30 percent. Obviously this move makes sense for most places<a href=\"http:\/\/solarbuildermag.com\/news\/11580\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5462,57,9666],"tags":[13730,2906,13095],"class_list":["post-133606","post","type-post","status-publish","format-standard","hentry","category-canada-international","category-leed-news","category-solar-power-energy","tag-canadian-solar-industries-association","tag-news","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/133606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=133606"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/133606\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=133606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=133606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=133606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}