{"id":133828,"date":"2015-12-01T15:15:38","date_gmt":"2015-12-01T15:15:38","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11590"},"modified":"2015-12-01T15:15:38","modified_gmt":"2015-12-01T15:15:38","slug":"u-s-army-reserve-installs-two-solar-carports-totaling-280-kw","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/u-s-army-reserve-installs-two-solar-carports-totaling-280-kw\/","title":{"rendered":"U.S. Army Reserve installs two solar carports totaling 280 kW"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The U.S. Army Reserve (USAR) and REC Solar announced the interconnection of two solar energy carports totaling 280 kW at USAR offices in Arizona and California. The solar arrays support the Department of Defense&rsquo;s (DoD) mandate of procuring 25 percent of its total facility energy from renewable sources by 2025.<a href=\"http:\/\/solarbuildermag.com\/news\/u-s-army-reserve-installs-two-solar-carports-totaling-280-kw\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13644,13731,2906,9974,13263,9674,10045],"class_list":["post-133828","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carports","tag-federal","tag-news","tag-projects","tag-rec-solar","tag-southwest","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/133828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=133828"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/133828\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=133828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=133828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=133828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}