{"id":134710,"date":"2015-12-04T17:30:04","date_gmt":"2015-12-04T17:30:04","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11648"},"modified":"2015-12-04T17:30:04","modified_gmt":"2015-12-04T17:30:04","slug":"lg-enphase-team-up-on-panel-microinverter-integration","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/lg-enphase-team-up-on-panel-microinverter-integration\/","title":{"rendered":"LG, Enphase team up on panel, microinverter integration"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>LG Electronics and Enphase Energy, have agreed to integrate Enphase&rsquo;s microinverter technology into LG Electronics&rsquo; new generation of AC solar modules (ACM) for the global solar market. The LG high-performance backsheet-integrated ACM will incorporate Enphase&rsquo;s next-generation S-series microinverter with LG&rsquo;s high-efficiency NeON 2 photovoltaic panels. Initial shipments of the LG-Enphase<a href=\"http:\/\/solarbuildermag.com\/news\/lg-enphase-team-up-on-panel-microinverter-integration\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12898,13581,12874,2906,12668,3000,5863],"class_list":["post-134710","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-enphase-energy","tag-lg-electronics","tag-microinverters","tag-news","tag-panels","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/134710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=134710"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/134710\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=134710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=134710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=134710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}