{"id":136337,"date":"2015-12-10T21:17:17","date_gmt":"2015-12-10T21:17:17","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11730"},"modified":"2015-12-10T21:17:17","modified_gmt":"2015-12-10T21:17:17","slug":"new-25-mw-project-pushes-sunlinks-southeastern-footprint-past-350-mw","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/new-25-mw-project-pushes-sunlinks-southeastern-footprint-past-350-mw\/","title":{"rendered":"New 25-MW project pushes SunLink\u2019s Southeastern footprint past 350 MW"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A new 27-MW DC solar project in Georgia propels SunLink Corp.&nbsp;beyond 350 MW DC of projects in 2015 in the southeastern United States and cements the company&rsquo;s position as the ground-mount market leader in the region. Georgia recently celebrated the new 135-acre solar facility, located in Jeff Davis County near<a href=\"http:\/\/solarbuildermag.com\/news\/11730\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12496,2906,12497,9751,12983],"class_list":["post-136337","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting","tag-news","tag-project","tag-south","tag-sunlink"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/136337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=136337"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/136337\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=136337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=136337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=136337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}