{"id":136557,"date":"2015-12-11T15:00:25","date_gmt":"2015-12-11T15:00:25","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11734"},"modified":"2015-12-11T15:00:25","modified_gmt":"2015-12-11T15:00:25","slug":"sunedison-signs-big-commercial-solarstorage-deal-with-ontario-ieso","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunedison-signs-big-commercial-solarstorage-deal-with-ontario-ieso\/","title":{"rendered":"SunEdison signs big commercial solar+storage deal with Ontario IESO"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunEdison signed a 10-year agreement with Ontario&rsquo;s Independent Electricity System Operator to supply 5 MW &mdash; 20 MWh &mdash; of battery storage to the province. The Ontario IESO works at the heart of Ontario&rsquo;s power system and is responsible for making sure everyone in the province gets the electricity they<a href=\"http:\/\/solarbuildermag.com\/news\/11734\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5462,57,9666],"tags":[573,442,13751,2906,12497,13648,12990],"class_list":["post-136557","post","type-post","status-publish","format-standard","hentry","category-canada-international","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-imergy","tag-news","tag-project","tag-solarstorage","tag-sunedison"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/136557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=136557"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/136557\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=136557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=136557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=136557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}