{"id":139285,"date":"2015-12-22T16:49:57","date_gmt":"2015-12-22T16:49:57","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11821"},"modified":"2015-12-22T16:49:57","modified_gmt":"2015-12-22T16:49:57","slug":"dominion-virginia-power-strikes-deal-for-110-mw-of-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/dominion-virginia-power-strikes-deal-for-110-mw-of-solar\/","title":{"rendered":"Dominion Virginia Power strikes deal for 110 MW of solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Dominion Virginia Power and the Commonwealth of Virginia reached an agreement to deploy 110 MW&nbsp;of solar power generation. Gov. Terry McAuliffe and Dominion joined together to announce the multi-year agreement. The Commonwealth will purchase the solar-generated electricity through a long-term agreement with Dominion. &ldquo;This is another positive step toward furthering<a href=\"http:\/\/solarbuildermag.com\/news\/dominion-virginia-power-strikes-deal-for-110-mw-of-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,281],"tags":[13707,2906,13172],"class_list":["post-139285","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-virginia","tag-dominion-energy","tag-news","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/139285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=139285"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/139285\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=139285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=139285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=139285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}