{"id":144009,"date":"2016-01-07T15:30:02","date_gmt":"2016-01-07T15:30:02","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11864"},"modified":"2016-01-07T15:30:02","modified_gmt":"2016-01-07T15:30:02","slug":"ppa-deal-solect-energy-igs-solar-install-457-kw-system-for-large-steel-manufacturer","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ppa-deal-solect-energy-igs-solar-install-457-kw-system-for-large-steel-manufacturer\/","title":{"rendered":"PPA deal: Solect Energy, IGS Solar install 457-kW system for large steel manufacturer"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Mass Tank, the largest steel tank manufacturer in New England, has partnered with Solect Energy of Hopkinton, Mass., and IGS Solar to install a 457-kilowatt (kW) system on the corporation&rsquo;s 60,000-sq-ft manufacturing facility in Middleborough, Mass. The solar energy generated from the array will be sold to Middleborough Gas &amp;<a href=\"http:\/\/solarbuildermag.com\/news\/solect-energy-igs-solar-install-system-steel-manufacturer\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13774,2906,9726,13429,12497,12565,13360],"class_list":["post-144009","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-igs-solar","tag-news","tag-northeast","tag-ppa","tag-project","tag-rooftop","tag-solect-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/144009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=144009"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/144009\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=144009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=144009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=144009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}