{"id":145565,"date":"2016-01-12T21:24:23","date_gmt":"2016-01-12T21:24:23","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11927"},"modified":"2016-01-12T21:24:23","modified_gmt":"2016-01-12T21:24:23","slug":"case-study-solving-commercial-site-challenges-with-adaptable-ground-mount-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/case-study-solving-commercial-site-challenges-with-adaptable-ground-mount-system\/","title":{"rendered":"Case study: Solving commercial site challenges with adaptable ground-mount system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>ASSA ABLOY, a&nbsp;premier North American shipping company, was looking to offset electric costs and minimize the carbon footprint at its Maryland distribution and processing hub. With more than 569,000-sq-ft of available roof space, the company determined that installing a solar system would provide the facility with an opportunity to accomplish<a href=\"http:\/\/solarbuildermag.com\/news\/solve-commercial-solar-challenges-with-adaptable-ground-mount-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13787,13203,13785,13786,12945,12496,12637,2906,3000,12497],"class_list":["post-145565","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-case-study","tag-commercial","tag-dce-solar","tag-grading","tag-ground-mount","tag-mounting","tag-mounting-guide","tag-news","tag-products","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/145565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=145565"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/145565\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=145565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=145565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=145565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}