{"id":14595,"date":"2013-07-10T08:38:48","date_gmt":"2013-07-10T08:38:48","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9926"},"modified":"2013-07-10T08:38:48","modified_gmt":"2013-07-10T08:38:48","slug":"hokkaido-to-utilize-60-mwh-vanadium-flow-battery-for-grid-storage","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hokkaido-to-utilize-60-mwh-vanadium-flow-battery-for-grid-storage\/","title":{"rendered":"Hokkaido To Utilize 60 MWh Vanadium Flow Battery For Grid Storage"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Hokkaido Electric&nbsp;plans to invest $200 million into a 60,000 kWh, vanadium redox flow battery that will store energy in order to back up its electricity grid. &ldquo;A redox battery is an electrochemical system that generates oxidation and reduction between two active materials, forming a redox system, on the surface of inactive electrodes (the electrodes themselves [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[11527,11528,11529,2903,442,11530,11531,2737,2906,11532,11533],"class_list":["post-14595","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-cost-of-lithium-ion-batteries","tag-cost-of-vanadium-flow-batteries","tag-cost-of-vanadium-redox-flow-batteries","tag-energy","tag-energy-storage","tag-hokkaido","tag-hokkaido-electric","tag-lithium-ion-batteries","tag-news","tag-vanadium-flow-batteries","tag-vanadium-redox-flow-batteries"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/14595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=14595"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/14595\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=14595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=14595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=14595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}