{"id":147663,"date":"2016-01-19T17:30:41","date_gmt":"2016-01-19T17:30:41","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12055"},"modified":"2016-01-19T17:30:41","modified_gmt":"2016-01-19T17:30:41","slug":"vizn-energy-receives-128-kw-battery-system-order-from-idaho-national-laboratory","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vizn-energy-receives-128-kw-battery-system-order-from-idaho-national-laboratory\/","title":{"rendered":"ViZn Energy receives 128 kW battery system order from Idaho National Laboratory"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>ViZn Energy Systems Inc., a provider of energy storage systems for microgrid and utility applications, received an order for a 128 kW\/320 kWh redox flow battery system based on its zinc-iron chemistry from Idaho National Laboratory (INL), part of the Department of Energy&rsquo;s (DOE) complex of national laboratories. ViZn&rsquo;s flow<a href=\"http:\/\/solarbuildermag.com\/news\/vizn-energy-redox-flow-battery-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,2906,13106,10045],"class_list":["post-147663","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-news","tag-vizn-energy-systems-inc-vizn","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/147663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=147663"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/147663\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=147663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=147663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=147663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}