{"id":149892,"date":"2016-01-27T17:27:52","date_gmt":"2016-01-27T17:27:52","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12137"},"modified":"2016-01-27T17:27:52","modified_gmt":"2016-01-27T17:27:52","slug":"have-a-drink-on-solar-castoro-cellars-winery-completes-625-kw-install","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/have-a-drink-on-solar-castoro-cellars-winery-completes-625-kw-install\/","title":{"rendered":"Have a drink on solar: Castoro Cellars winery completes 625-kW install"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Castoro Cellars has completed an installation of a massive new solar project that will allow the winery to run 100&nbsp;percent&nbsp;on solar power. The 625-kW&nbsp;installation, which covers nearly three acres, will have an annual production of over 1 million&nbsp;kWh and eliminate an estimated $20,000 per month electricity bill. This marks the<a href=\"http:\/\/solarbuildermag.com\/news\/have-a-drink-on-solar-castoro-cellars-winery-install\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,2906,12497,13263,10045,13636],"class_list":["post-149892","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-news","tag-project","tag-rec-solar","tag-west","tag-winery"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/149892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=149892"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/149892\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=149892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=149892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=149892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}