{"id":150200,"date":"2016-01-28T19:01:32","date_gmt":"2016-01-28T19:01:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12145"},"modified":"2016-01-28T19:01:32","modified_gmt":"2016-01-28T19:01:32","slug":"princeton-power-systems-earns-big-capital-investment-and-new-iso-certification","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/princeton-power-systems-earns-big-capital-investment-and-new-iso-certification\/","title":{"rendered":"Princeton Power Systems earns big capital investment and new ISO certification"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Princeton Power Systems (PPS), is a global designer and manufacturer of technology products and embedded software for energy storage, microgrid operations, and electric vehicle charging, and it must be doing something right as the company was just recognized by the International Organization for Standardization (ISO) for its process driven design<a href=\"http:\/\/solarbuildermag.com\/news\/princeton-power-systems-earns-big-capital-investment-and-new-iso-certification\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,13819,697,2906,5217,3000],"class_list":["post-150200","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-iso-certification","tag-microgrid","tag-news","tag-princeton-power-systems","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/150200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=150200"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/150200\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=150200"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=150200"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=150200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}