{"id":150227,"date":"2016-01-28T21:39:27","date_gmt":"2016-01-28T21:39:27","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12153"},"modified":"2016-01-28T21:39:27","modified_gmt":"2016-01-28T21:39:27","slug":"watch-advice-for-installing-on-a-challenging-solar-site","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/watch-advice-for-installing-on-a-challenging-solar-site\/","title":{"rendered":"WATCH: Advice for installing on a challenging solar site"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A big challenge for solar going forward, as the industry soars, is accommodating projects that just a few years ago would not have been considered viable sites. Luckily, smart people, like&nbsp;solar industry&nbsp;engineers, have been working hard to address these challenges and provide on-the-ground guidance and product solutions. RELATED: Mounting Challenges:<a href=\"http:\/\/solarbuildermag.com\/news\/training-for-mounting-on-challenging-solar-site\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12496,2906,12983,13156],"class_list":["post-150227","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting","tag-news","tag-sunlink","tag-training"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/150227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=150227"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/150227\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=150227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=150227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=150227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}