{"id":153521,"date":"2016-02-08T15:47:32","date_gmt":"2016-02-08T15:47:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12193"},"modified":"2016-02-08T15:47:32","modified_gmt":"2016-02-08T15:47:32","slug":"brownfield-in-massachusetts-receives-6-mw-system-developed-by-syncarpha-capital","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/brownfield-in-massachusetts-receives-6-mw-system-developed-by-syncarpha-capital\/","title":{"rendered":"Brownfield in Massachusetts receives 6-MW system, developed by Syncarpha Capital"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; Syncarpha Capital LLC, Borrego Solar Systems Inc., and Renewable Energy Massachusetts LLC (REM)&nbsp;completed a 6-MW solar array located on the former Palmer Metropolitan Airfield in Palmer, Mass. The Palmer Airfield project is unique in that it is both the first and, at 6 MW, the largest Department of Energy<a href=\"http:\/\/solarbuildermag.com\/news\/brownfield-in-massachusetts-receives-6-mw-system-developed-by-syncarpha-capital\/\">Read More<\/a><\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12984,960,2906,9726,12497,13830,13294,13172],"class_list":["post-153521","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-borrego-solar","tag-brownfields","tag-news","tag-northeast","tag-project","tag-renewable-energy-massachusetts","tag-syncarpha-capital","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/153521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=153521"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/153521\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=153521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=153521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=153521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}